30 September 2002 30 September 2002

30 September 2002

They poured the concrete floor in the middle third of the building today. I also noticed a utility trench that had been worked on that came out to the road.
Home

26 September 2002 28 September 2002

26-28 September 2002

I was out of town for a few days, so I did not get to drive by the chapel. However, my brother went by and took a few pictures. As I look over the site, nothing new strikes my memory. Maybe the rain scared them off for a couple of days.
28 September 2002
Home

25 September 2002

25 September 2002

About two thirds of the floor was poured today. They also worked on both entrances, laying the drainage pipe and then covering with rocks so they can pour the asphalt on top.
25 September 2002 25 September 2002
Home

24 September 2002 24 September 2002

24 September 2002

Today as I was watching them level the hole where the font would be, the truck with the font showed up.

They also worked hard on the rebar. Most of the building looks like it has the rebar in place for the concrete. The only area I noticed that was missing was the bathrooms.

Home

23 September 2002 23 September 2002

23 September 2002

They worked on the rebar for the floor today. It seems that most of the middle section of the building has the rebar in place. None of the classrooms have been prepared.
Home

20 September 2002

20 September 2002

When Marie went by today she saw them dumping some gravel. As I looked over the site, it appears that the center of the building has had the gravel spread out so that they can pour the cement.
19 September 2002 19 September 2002

19 September 2002

The framers were there again today putting together pieces of walls. The plumber was also there today still running water and sewer lines in the floor.
Home

18 September 2002

While we do not yet have a floor, we do have a storage building. The framers put together the out building today.

I also went by at lunch to see what they were working on. They are still running utilities throughout the floor of the building. I watched as they ran some of the sewer lines (guessing by the size of the pipe).

18 September 2002 18 September 2002
Home

17 September 2002 17 September 2002

17 September 2002

We now know the name of the contractor, APEX M & P Construction LLC. It looks like they have built quite a few large buildings in the area.
Home

16 September 2002 16 September 2002

16 September 2002

I could not tell what work had been done today. I am not able to see the small detail that must be happening to get ready for the floor from accross the street. I expect to see the floor go in any day now, though. I can't believe they want the framing wood laying around too long without putting it up.
Home

13 September 2002 13 September 2002

13 September 2002

Today I noticed a small brick wall right in front of the construction trailer. It seems too small for our sign out front. But on the other hand, what else would it be? I guess we shall wait and see if it turns out to be a sign for the chapel.
Home

12 September 2002 12 September 2002

12 September 2002

No floor yet, but there is still plenty of activity going on. They were digging trenches for what looked like the sewer line.
Home

11 September 2002

11 September 2002

The framers continued framing today. But they had no where to put the walls because the floor is still not in. They just stacked them off to the side.

11 September 2002 I also saw them digging where I expected the baptismal font to be. Guess we will see soon enough.

Home

10 September 2002

10 September 2002

The construction crew seems eager to get started framing the building. Today a whole bunch of lumber showed up at the chapel. I even watched them construct a few walls. They walls are not up yet because they still have not poured the floor. Hopefully we will see the floor in the next few days.

10 September 2002 I also noticed a man standing in a large hole in the ground in the middle of the building. It took me a minute to decide that he could have been standing where the baptismal font will be. However, it was in a part of the building where I didn't think the font was going. I hope I can somehow get a floor plan of the building so I can tell where things are supposed to be.

18 September 2002...I have now seen the floor plan. He was indeed standing where the baptismal font will be.

Home

9 September 2002 9 September 2002

9 September 2002

I didn't notice any activity today.

Home 7 September 2002

7 September 2002

Sorry I didn't get a picture last night. I had too many things to do before the BYU football game. And I didn't get a chance to get the picture.

I can see they worked some on the storm drains for the parking lot. It looks as if they installed some of the drains on the north side of the chapel.

Home

5 September 2002 5 September 2002

5 September 2002

Today I watched as they were spreading out the gravel around the trenches for the utilities. They were using the green bobcat you can see in the picture.

Home 4 September 2002 4 September 2002

4 September 2002

Again I couldn't tell what work had been done. They are doing detail work on the utilities that I can't see from across the street.

Home

3 September 2002 3 September 2002

3 September 2002

Today was one of those days where I really didn't notice any work. Except for the fact that the yellow caution tape appeard today. Centrainly, they did more work than that. I just couldn't tell from across the street.